Grizzly H-Frame Install Grizzly H-Frame Install KMS were awarded to install the grizzly H-frame for CR01 crusher, this steelwork needed to be installed in situ and welded out in place due to the size of the components. All the welds needed to be NDT for the QA process. Back to Projects