KMS designed, planned and coordinated the installation of a 400UB beam to be attached to a concrete course way structure. The beam had a 20m span to carry a 355mm slurry line across the course way. conducting the lift with a 220t slew crane to get a 45m reach for the install at North Parkes Mines.