The KMS team have been welding poly with the T900 Tracstar for the flood line at the Rosedale Surface Infrastructure Project at Northparkes Mines.

Rosedale Surface Infrastructure Flood Line
Rosedale Surface Infrastructure Flood Line
Rosedale Surface Infrastructure Flood Line